ArchitectShigeru Ban Architects
Executive ArchitectCottle Carr Yaw Architects
Structural EngineerKL&A, Inc In Association With Hermann Blumer (Création Holz Gmbh)
Services EngineerBeaudin Ganze Consulting Engineers, Inc.
General ContractorTurner Construction
Glazing Systems ContractorHarmon Inc.
Custom Timber FabricatorSpearhead
Wood Screen FabricatorGEN3 in partnership with Lyman Fogel
Founded in 1979, The Aspen Art Museum was moved to its new 33,000 ft2 (3,070 m2), four-level facility in 2009. The building, designed by 2014 Pritzker Prize recipient Shigeru Ban, houses six gallery spaces, a roof top sculpture garden, and an outdoor commons. The structure itself features a Grand Stair, a Moving Glass Room Elevator, a Woven Wood Screen, a Wood Roof Truss and Walkable Skylights.
Front’s role as facade consultant to the Aspen Art Museum began at project inception to enable the articulation of an engineered wood exterior screen for the main street facades of the building, trafficable interior and exterior glass floors, fire-resistant curtain wall, an exterior glass elevator, folding glass exterior walls, and enclosure of the timber space-frame roof structure. Through engineering analysis, design detailing, and specification we further developed high-performance solutions for all exterior envelope systems, which were evaluated in visual mockups and trial installations. The building opened on schedule in August 2014, and has continued to attract visitors who ride the glass elevator like a cable-car up to its roof and navigate each gallery in a descent evocative of the surrounding ski slopes.
The project won a 2017 AIA Architecture Award, recognizing the best architecture of the year.